在线激情 I 激情va I 亚洲欧美洲成人一区二区三区 I 涩涩网站视频 I 亚洲在线视频一区 I 国产乱码二卡3卡四卡 I 91插插插插 I 亚洲图片另类图片激情动图 I 国产欧美亚洲精品a第一页 I 国产嫩草影院在线观看88 I 伊人网在线免费 I 免费高清一区二区三区 I 999在线视频精品免费播放观看 I 精品美女在线 I 国产欧美在线一区 I 国产女人av在线 I 91观看视频 I 丁香婷婷深爱五月亚洲综合 I 欧美一区一区 I 国产69页 I 玖玖在线观看 I 亚洲片免费看 I 女人国产香蕉久久精品 I 一区二区成人在线 I 欧洲性久久精品 I 午夜神器在线观看 I 美色综合 I 在线观看免费人成视频网 I 日韩色网址 I 乱精品一区字幕二区 I 免费污片软件 I 中文字幕一区二区三三 I 亚洲福利国产精品 I 69日小视频在线观看 I 亚洲高清不卡在线

Reactor Technology

24-Hour Service Hotline

+86-13606176623
HomeProductCondensing and crystallizing slicing machine

Products

upload/ProdPic/202012281445555990.jpg
Condensing and crystallizing slicing machine
Product Description

Instructions for use and installation of condensing crystallization slicer


1. First check whether the equipment is damaged, and then install it in place. Pay attention to ensure the horizontal position of the drum.


2. Connect the conveying pipe with the slicer, and install the regulating valve on the feeding pipe.


3. Connect the water cooling joints at both ends of the roller according to the water inlet and water outlet, and connect the heat medium heating pipe with the equipment.


4. Start the machine to check whether it is running normally. According to the instructions of the electric cabinet, first press the power start button, and then turn on the frequency converter to adjust the speed. If there is a slow speed, observe whether it is running normally. Then adjust the gap between the slicer and the roller.


5. Connect the cooling water feeding blade, adjust the feeding speed according to the slice thickness, and check whether the slice thickness and other requirements can meet the requirements. There is no gap between slicer device and rotary roller.


6. Generally, if the freezing point of normal materials is above 50 degrees, tap water can be used for cooling. If the freezing point is low, refrigeration equipment should be equipped. The faster the cooling, the higher the output.


Operation procedure of condensing crystallization slicer


1. Before using the equipment, preheat the discharge basin first to avoid the failure of normal operation due to the solidification layer between the material and the cylinder. Generally, keep the material in liquid state.


2. Before feeding, the drum should be started, and the drum speed can be adjusted to 2 ~ 3 revolutions per minute.


3. After feeding, the rotation speed of the cylinder can be adjusted according to the chip requirements, and the chip output will be determined according to the thickness and cooling effect.


4. At the discharge port, the material can be directly received by bag or through the bin.


A professional factory that manufactures chemical and pharmaceutical equipment, a comprehensive enterprise integrating R&D, production and service

Technical Support:YOUWEI

Tel:+86-13606176623

Add:East of yuanhu road, wutang community, Xue lang street,Binhu District, Wuxi City, Jiangsu Province (inside gongming machinery)

Email:cnrq@cnrq.com